Completing projects up to $30 million dollars, Jordan Pile Driving has the capability to tackle any size project, no matter the size. We have driven piles in every county in the state of Alabama.  Jordan Pile Driving has driven from 8” pipe piles to as large as 66” cylinder piles and drove the longest concrete pile on the Gulf Coast at 175’ long.

Patial list of past projects:

2010 Mississippi Power, Gulfport, MS.
    -         Drove 1,070 wall feet of AZ19-700 sheet piles
               and installed tie rods for the barge unloader
               dock

2010 ALDOT, Mobile, AL. (J.S. Walton Construction)
    -         Drove 375 wall feet of PZ 35 sheet piles for slide
              correction project on SR 158

2010 Perdido Pass, Orange Beach, AL. (Thompson Engineering)
    -         Drove 29 pcs. of 42” dia. pipe piles, 9 pcs. of HP 14 x 73 and 40 wall feet of AZ 14-700  for oil spill
              protection project

2010 Millard Refrigeration, Mobile, AL. (Esfeller Construction)
    -         Installed 250 - 24” dia. auger cast piles for tank foundation

2009 CSX Railroad, Mobile, AL.
    -         Drove 46 pcs. of 24” dia. pipe piles and replaced the entire bridge crossing Catfish Bayou in the Mobile
              Delta

2009 Thyssen Krupp USA, Mobile, AL. (Scott Bridge Company)
    -         Drove 196 pcs. of 24” sq. and 147 pcs. of 18” sq. prestress piles for the dock facility

2009 Synergy, Mobile, AL. (G.A. West and Company)
    -         Drove 300 wall feet of SCZ 21 sheet piles

2008 NGSS Ship Systems, Pascagoula, MS. 
    -         Drove 1,600 18" sq.prestress piles up to 90’ long for Bay 6 and Bay 7 Dock addition

2008 CSX Railroad, Mobile, AL.
    -         Repair fender system damage to 14 mile bridge crossing Mobile River.

2008 Chevron Refinery, Pascagoula, MS. (Canfer Construction Co.)
     -         Drove 547 pcs. of  20” dia. and 12.75” dia. pipe
                piles

2008 Williams Energy, Coden, AL. (InfraSource Underground Const. Co.)
     -         Drove 12.75” dia. pipe piles and AZ18 sheet
               piles

2008 ALDOT Hillcrest Rd. Bridge (Newell Bush Construction)
     -         Drove 30" sq. prestress piles for new bridge on                Hillcrest Rd.

2007 NGSS Ship Systems, Pascagoula, MS. (Ben M. Radcliff Contractor)
     -         Drove 12.75” dia. pipe piles and 16” sq. prestress piles for IPD and Machine Shops.

2007 NGSS Ship Systems, Pascagoula, MS. (Ben M. Radcliff Contractor)
    -         Drove 16” sq. prestress piles for new propulsion shop

2007 Oil Recovery Services, Mobile, AL.
     -         Drove AZ19-700 sheet piles and 30” dia. pipe piles

2007 Alabama Power, Leroy, AL. (Black and Veatch)
     -         Install temporary workbridge and 54" dia. pipe piles for drilled piers on a soil stabilization project

2007 CSX Railroad Mobile, AL.
    -         Repair fender system at 14 mile bridge over Mobile River

2006 Southern Company, Pensacola, FL.
     -         Drove sheet piles for hurricane protection

2006 USS Alabama Battleship
    -       Straighten listing ship and repair access gangways

2006 Mobile County
    -         Rebuild fishing pier at USS Alabama

2006 Olin Chemical, McIntosh, AL. (Empire Construction)
    -         Drove timber piles for new spillway

2005 CSX Railroad Pascagoula, MS.
    -        Repair 3 major bridges in Pascagoula, Gautier, and Bay St. Louis, MS.